<html><head><meta http-equiv="Content-Type" content="text/html charset=utf-8"></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space;" class=""><div class="">November voting wrapped up on December 8th as planned.</div><div class="">I’m just now getting to tallying and sharing the results.</div><div class=""><br class=""></div><div class="">9 contributors submitted 12 compensation requests this month.</div><div class="">This is the same number of contributors as submitted last month.</div><div class=""><br class=""></div><div class="">Total compensation requested was 71,750 BSQ.</div><div class="">Total compensation received was 71,750 BSQ.</div><div class="">This is 1.5x last month’s total of 48,500 BSQ.</div><div class=""><br class=""></div><div class="">Going forward, we’ll no longer “rebase” totals down to 2.5MM BSQ.</div><div class="">This was an interesting idea, but too much work for too little benefit in the end.</div><div class="">We’ll do a once-and-final rebasing down to 2.5 MM when we go live on mainnet.</div><div class=""><br class=""></div><div class="">Over the next two voting rounds taking place in January and Feburary, we want to roll out the bonding aspects of the Phase Zero plan.</div><div class="">The first step is to get role specifications in place that define each role.</div><div class="">You’ll see an email shortly from Chris Sacher on this topic, with instructions on how to get your role spec(s) in order.</div><div class="">From January forward, having these specs in place will be a prerequisite for submitting compensation requests for these roles.</div><div class="">We (@csacher and I) will be around here and in the #roles channel to help with this process.</div><div class=""><br class=""></div><div class="">Finally, from this point forward, I won’t cc individuals on contrib-list emails.</div><div class="">If you’d like to receive them emails, please subscribe to the mailing list at</div><div class=""><a href="https://lists.bisq.network/listinfo/bisq-contrib" class="">https://lists.bisq.network/listinfo/bisq-contrib</a>.</div><div class=""><br class=""></div><div class="">Cheers,</div><div class=""><br class=""></div><div class="">- Chris </div><div class=""><br class=""></div><div class=""><br class=""></div><div class=""><br class=""></div><div><blockquote type="cite" class=""><div class="">On Dec 9, 2017, at 12:54 AM, Chris Beams <<a href="mailto:chris@beams.io" class="">chris@beams.io</a>> wrote:</div><br class="Apple-interchange-newline"><div class=""><div class="">This is the last call for voting on November requests. If you haven’t voted yet, and intend to, please do so now. I’ll double-check the results and complete the voting process on Monday. Thanks, everyone.<br class=""><br class=""><br class=""><blockquote type="cite" class="">On Dec 5, 2017, at 10:04 PM, Chris Beams <<a href="mailto:chris@beams.io" class="">chris@beams.io</a>> wrote:<br class=""><br class="">Thanks to all who submitted compensation requests. We have 11 submissions total, several more than our voting round last month.<br class=""><br class="">All requests have been added to the stake and vote tracking spreadsheet [1], and instructions on how to vote can be found at [2].<br class=""><br class="">Per the Bisq DAO calendar at [3], the voting period lasts 3 days. It begins with this email, which I’m sending late in the day on December 5th, and will completes at end of day on December 8th.<br class=""><br class="">ACTION REQUESTED: please have your votes in by end of day (in your time zone) on December 8th. Thanks.<br class=""><br class="">- Chris<br class=""><br class="">P.S.: I was not able to get bonding details worked into the spreadsheet this month as planned; we'll get this integrated by next month’s voting round.<br class=""><br class="">[1]: <a href="https://docs.google.com/spreadsheets/d/1xlXDswj3251BPCOcII-UyWlX7o7jMkfYBE-IZ5te5Ck/edit#gid=1051978921" class="">https://docs.google.com/spreadsheets/d/1xlXDswj3251BPCOcII-UyWlX7o7jMkfYBE-IZ5te5Ck/edit#gid=1051978921</a><br class="">[2]: <a href="https://github.com/bisq-network/docs/blob/master/dao/phase-zero.adoc#how-to-vote" class="">https://github.com/bisq-network/docs/blob/master/dao/phase-zero.adoc#how-to-vote</a><br class="">[3]: <a href="https://bisq.network/calendar" class="">https://bisq.network/calendar</a><br class=""><br class=""><br class=""><blockquote type="cite" class="">On Dec 4, 2017, at 12:17 AM, Chris Beams <<a href="mailto:chris@beams.io" class="">chris@beams.io</a>> wrote:<br class=""><br class="">In order to clarify a few outstanding questions and finish preparing the voting spreadsheet, we’ll postpone the start of November compensation request voting until Wednesday the 6th. Thanks all. <br class=""><br class="">- Chris<br class=""><br class=""><br class=""><blockquote type="cite" class="">On Nov 29, 2017, at 2:00 AM, Chris Beams <<a href="mailto:chris@beams.io" class="">chris@beams.io</a>> wrote:<br class=""><br class="">If you haven’t done so already, please submit your November compensation requests at [1] by end of day on Sunday Dec 3rd. See [2] for instructions.<br class=""><br class="">Normally we would start voting on December 1st, but since I’m getting this email out a little later than I intended, let’s start voting on Monday the 4th and complete it by Wednesday the 7th. That’ll give the rest of this week and weekend to get our requests together.<br class=""><br class="">Note also that we’ll be working bonding into the stake and voting spreadsheet [3] for the first time this month, along with a couple other changes. More on that later, just a heads-up for now.<br class=""><br class="">Thanks,<br class=""><br class="">- Chris<br class=""><br class="">[1]: <a href="https://github.com/bisq-network/compensation/issues/" class="">https://github.com/bisq-network/compensation/issues/</a><br class="">[2]: <a href="https://github.com/bisq-network/docs/blob/master/dao/phase-zero.adoc#how-to-request-compensation" class="">https://github.com/bisq-network/docs/blob/master/dao/phase-zero.adoc#how-to-request-compensation</a><br class="">[3]: <a href="https://docs.google.com/spreadsheets/d/1xlXDswj3251BPCOcII-UyWlX7o7jMkfYBE-IZ5te5Ck/edit#gid=0" class="">https://docs.google.com/spreadsheets/d/1xlXDswj3251BPCOcII-UyWlX7o7jMkfYBE-IZ5te5Ck/edit#gid=0</a><br class="">_______________________________________________<br class="">bisq-contrib mailing list<br class=""><a href="mailto:bisq-contrib@lists.bisq.network" class="">bisq-contrib@lists.bisq.network</a><br class="">https://lists.bisq.network/listinfo/bisq-contrib<br class=""></blockquote><br class=""></blockquote><br class="">_______________________________________________<br class="">bisq-contrib mailing list<br class=""><a href="mailto:bisq-contrib@lists.bisq.network" class="">bisq-contrib@lists.bisq.network</a><br class="">https://lists.bisq.network/listinfo/bisq-contrib<br class=""></blockquote><br class=""></div></div></blockquote></div><br class=""></body></html>