[bisq-network/compensation] [WIP] For Cycle 11 (#499)

Christoph Atteneder notifications at github.com
Mon Feb 17 12:51:55 UTC 2020


## Summary

 - BSQ requested:`X` (X USD @ X USD/BSQ)

This is a compensation request for contributions delivered from last cycle until now (Feb 13). I calculated the amount based on the new three months average of `X USD` for `1 BSQ` mentioned in https://github.com/bisq-network/compensation/issues/X.

## Contributions delivered

### Reviews

_Reviewed PRs:_

<details>
<summary>View all reviewed PRs (X)</summary>

My PR reviews this month were created by reviewing the results of this GitHub Issues search query:
[is:pr reviewed-by:ripcurlx updated:2020-02-14..2020-03-13 sort:updated-desc](https://github.com/bisq-network/bisq/pulls?page=1&q=is%3Apr+reviewed-by%3Aripcurlx+updated%3A2020-02-14..2020-03-13+sort%3Aupdated-desc&utf8=%E2%9C%93)



Following PRs Review efforts are so small to track them separately:

**Total USD amount for this remaining PRs**: `X`

</details>

**USD amount requested:** `X`

### Development

I was working mainly on the v1.2.8 release and following PRs were merged to master.

My merged PRs this month were created by reviewing the results of this GitHub Issues search query:
[is:pr author:ripcurlx is:merged merged:2020-02-14..2020-03-13 sort:updated-desc](https://github.com/bisq-network/bisq/pulls?utf8=%E2%9C%93&q=is%3Apr+author%3Aripcurlx+is%3Amerged+merged%3A2020-02-14..2020-03-13+sort%3Aupdated-desc+)

- [Accept empty config values](https://github.com/bisq-network/bisq/pull/3978)

**USD amount requested:** `X`

Following PRs are covered by other role efforts already or are minor.


### Testing

**USD amount requested:** `X`

### Release
To improve transparency I'll add the release efforts now separately and not combined with the Bisq Desktop Maintainer role anymore. Documentation of the release process can be found [here](https://github.com/bisq-network/bisq/blob/master/docs/release-process.md).

**USD amount requested:** `X`

### Support
Monitoring the support channel during my [L2 times](https://calendar.google.com/calendar/embed?src=u4eea6bffk10b76l2cmb86eqqc%40group.calendar.google.com&ctz=Europe%2FVienna) and am investigation atm one issue where funds are still locked up although trades were completed successfully.
Helping out L1 support whenever needed.

Support cases:

- [Funds are still locked after trade has been completed](https://github.com/bisq-network/bisq/issues/3975)

**USD amount requested:** `X`

## Contributions in progress

I'm focusing right now on v1.2.8 and continue to get the PR workflow more streamlined.
Besides that I'm looking into [USDT integration](https://github.com/bisq-network/admin/issues/11) and am evaluating the current state of the [account signing roll-out](https://github.com/bisq-network/admin/issues/10).

All efforts for my role as dev team lead (roughly occupied ~40% of my time) won't be put up for compensation until it is proven to have the success we are looking for.


## Roles performed

- Bisq Desktop Maintainer: https://github.com/bisq-network/roles/issues/63#issuecomment-585819704 `X USD`
- Analytics Maintainer: https://github.com/bisq-network/roles/issues/40#issuecomment-585821698 `X USD`
- Bitcoin Fullnode Operator: https://github.com/bisq-network/roles/issues/67#issuecomment-585823336 `50 USD`
- GitHub Admin:  https://github.com/bisq-network/roles/issues/16#issuecomment-585824730 `25 USD`

**USD amount requested for all these roles (see detailed amount for each role):** `X`

The following are roles where I play a secondary role, and do not (necessarily) do monthly reports:

- YouTube Admin: https://github.com/bisq-network/roles/issues/56
- Bisq Events Maintainer: https://github.com/bisq-network/roles/issues/65
- Growth Maintainer: https://github.com/bisq-network/roles/issues/42
- Transifex Admin (secondary): https://github.com/bisq-network/roles/issues/20
- Bisq Design Maintainer: https://github.com/bisq-network/roles/issues/75 (primary, but on-hold because of no active work)

-- 
You are receiving this because you are subscribed to this thread.
Reply to this email directly or view it on GitHub:
https://github.com/bisq-network/compensation/issues/499
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.bisq.network/pipermail/bisq-github/attachments/20200217/0b73fe9a/attachment-0001.html>


More information about the bisq-github mailing list